Darlington Community Recreation Advisory Group (DCRAG)

DCRAG Terms of Reference

DCRAG 2020 quarterly meetings will be held at the Community Pavilion;

  • Monday, 24th February
  • Monday, 25th May
  • Monday, 31st August
  • Monday, 30th November.

Capital Request 2020 – submitted to the Shire

The 2020 capital requests include (but are not limited to) the following:

  • Completion of paving/grass installation on the western end of the community pavilion
  • Boxing in of the Tree Protection Zones (TPZ) on south side of the oval
  • Continuation of support for the Darlington Skate Park Community Masterplan
  • Darlington Hall improvements
  • Replacement of the astro turf wicket
  • upgrade of the existing BBQ facility on the oval
  • A new red asphalt accessibility pathway
  • A new soft fall pathway
  • A nature based fitness circuit
  • Installaion of a third cricket net
  • Large Tree Replacement Masterplan
  • Infrastructure improvements to the Owen Street Playground / Shop crossing area
  • Underground power lines on Pine Terrace
  • Support of DaSRA for funds to comple of the Pavilion

Capital Request 2019 – submitted to the shire

DCRAG has requested allocation of money for the following Community Recreation areas (summary below). Please download the DCRAG proposal to Shire Jan 2019 pdf for full details:

    • Replacement of the astro turf wicket
    • Upgrade to existing barbeque near Darlington Hall
    • Additional support for Stage 2 of the Pavilion upgrade
    • Completion of paving /grass near pavilion and skate park
    • Accessible pathway through the oval
    • Safety, stone wall around southern end of oval
    • Suggested upgrades to some seating areas
    • Support for the Darlington Skatepark Community Master Plan
    • Exercise equipment on the oval
    • Large Tree Replacement Masterplan
    • Funding of large tree planting when the Large Tree Masterplan has been developed
    • Safety improvements to crossing area on Owen Road.
  • Minutes
  • Graphics of DCRAG members

Projects / Subcommittee

  • Skate park Half-pipe – 2017 ongoing
  • Masterplan Skate park area 2018 – ongoing

Large Tree Replacement Management Plan 2019 -ongoing

  • Retaining wall / new access paths in front of Hall – ongoing
Map of Proposed Retaining Wall
  • Retaining wall / new access paths / seating / stone wall / trees – future
  • Masterplan for whole of Recreation area – future

The pdf available for download outlines the proposal that DCRAG sent to the Shire of Mundaring in January.